LRT Ampang/Sri Petaling Line facing delays today, power supply issue – shuttle train, buses deployed

LRT Ampang/Sri Petaling Line facing delays today, power supply issue – shuttle train, buses deployed

LRT Ampang/Sri Petaling Line commuters, take note. Train services are currently experiencing delays due to power supply issues between Awan Besar and Sri Petaling stations. Repair works are ongoing. This is from an update by Rapid KL at 2.46 pm.

As such, there will be longer waiting times at the platform, especially between Bandar Tasik Selatan and Awan Besar stations. Trains from Putra Heights will turn back at Kinrara BK5, while trains coming from Sentul Timur will turn back at Bandar Tasik Selatan. The estimated frequency is seven and 10 minutes, respectively.

To bridge the gap, there will be shuttle trains between Bandar Tasik Selatan and Awan Besar stations, as well as from Kinrara BK5 to Awan Besar, with a frequency of 15 minutes. If this is part of your route, disembark and get on the shuttle train.

Alternatively, take the free buses that have been deployed. The buses will ply a route that passes Bandar Tasik Selatan, Sungai Besi, Bukit Jalil and Sri Petaling stations. The frequency will be around 15 to 20 minutes, subject to traffic conditions.

Rapid KL says that auxiliary police officers and station staff are on the platforms and stations to assist commuters and there will be announcements over the PA.

Sell your car, get paid in 24 hours

Renew your car insurance with us, 10% discount!

Use the promo code 'PAULTAN' when you checkout for 10% discount!

Renew Car Insurance

Danny Tan

Danny Tan loves driving as much as he loves a certain herbal meat soup, and sweet engine music as much as drum beats. He has been in the auto industry since 2006, previously filling the pages of two motoring magazines before joining this website. Enjoys detailing the experience more than the technical details.

 

Comments

  • Grandpa Ash Burn Baginda on Apr 02, 2026 at 3:36 pm

    Why letting the tree grows until trespassing onto elevated rail track? Should immediately prune and uproot those trees

    Thumb up 1 Thumb down 1
    • brain use on Apr 02, 2026 at 3:50 pm

      because the tree was there first. thats like asking why allow tempel to trespass at USJ 25 and Jalan Masjid India, should ask Jakel to immediately demolish it…

      Thumb up 4 Thumb down 0
  • ues brain on Apr 02, 2026 at 3:37 pm

    Lock should arrest, charge, jail those cable thieves . and finally strip them of civitzenship. sorry my mistake Loke cannot do that because he isnt polis minister or law minister or AG or JPN minister

    Thumb up 1 Thumb down 1
  • Pastu ada hati suh rakyat guna pengangkutan awam.

    Thumb up 2 Thumb down 0
 

Add a comment

required

required


 
 
 
 
 
 
Related PaulTan.org Content: Tech | 2025 | Electric: Electric | Reviews: Reviews | Motorsports | Featured: Featured